Four terraced houses, Hondón de las Nieves
Inside, the partitions and the suspended ceiling are up and the floor tiling is already laid. The services are still exposed, before the partitions are closed. Outside, the windows are in and the surrounding works are finished.
Handover expected: January.

140 m² villa, Hondón de las Nieves
Starts between November and December.
Full renovation of a terraced house, Hondón de las Nieves
We do not usually take on renovations. We are doing this one because it is for a long-standing client.
Starts in November.
This is everything we have under way right now. We work on few sites at a time, on purpose: it is the only way to stay on top of all of them.