What we are working on

The rear façade of the houses, with the windows in and the surrounding works finished.
The service openings in the partition, with the boxes and the cabling exposed before they are closed.
A room with the partitions finished, the suspended ceiling frame up and the floor tiling laid.
The concrete stair between floors, with the floor tiling laid and the suspended ceiling frame still exposed.

Four terraced houses, Hondón de las Nieves

Inside, the partitions and the suspended ceiling are up and the floor tiling is already laid. The services are still exposed, before the partitions are closed. Outside, the windows are in and the surrounding works are finished.

Handover expected: January.

Render of the villa project: two floors, the ground floor clad in stone and the upper floor white, with large windows at the front.
Project render

140 m² villa, Hondón de las Nieves

Starts between November and December.

Full renovation of a terraced house, Hondón de las Nieves

We do not usually take on renovations. We are doing this one because it is for a long-standing client.

Starts in November.

This is everything we have under way right now. We work on few sites at a time, on purpose: it is the only way to stay on top of all of them.