How we work

What we build

The wall, the structure, the finishes of your range, the installations.

The full breakdown, category by category, is on the pricing page.

See what the price includes


What we handle for you

One point of contact, not five

It is not just «we take care of everything». It is the real list, with names and procedures.

Architect and building surveyor

Coordinated through a single point of contact — you don’t deal with each of them separately.

Building licence

We prepare the documentation with you and support you through the application, so that it is granted before work starts. The licence is in your name.

Utility connections

Paperwork with the water and electricity companies.

Energy performance certificate

Included — it is not a separate step you have to arrange yourself.

Control of every stage

Your site supervision, an independent professional hired in your name, certifies each stage before each payment. We open the site to them whenever they want.


Why you can trust us to deliver

3-4

builds at once, at most

We don’t take on more builds than we can look after properly: when we reach the limit, the next one waits its turn.

We don’t join a build as just another trade, without coordinating the whole. And we don’t promise timescales we don’t control: licences and utility connections are shown separately, with their own calendar.


How you will know it is well built

The eight tests

The ones required by regulations are signed off by an independent laboratory; the rest we measure in your house and hand over to you.

8tests
A terrace on site flooded with a sheet of water, with the hose and the drain in view.
A watertightness test on one of our terraces: it is flooded and left, before the house is handed over.
  • Roof watertightnessour ownNo water getting in from above.
  • Façade watertightnessour ownNo water getting in through the windows, which is where it gets in.
  • Terrace watertightnessour ownThe finished terrace is flooded and left standing in water, to see whether any leak shows up before you move in.
  • Installation leak testsour ownPipes are tested at a higher pressure than they will ever have to carry.
  • Thermal imagingour ownIf there is a cold spot, it shows up in the photo.
  • Concreteby codeA sample is taken on site and a laboratory crushes it.
  • Steelby codeInspection of the structural steel.
  • Energy performance certificateby codeYour home’s official energy label.

The law requires three of the eight. We do the other five because hardly anyone around here does them, and they are the ones that really tell you what living in your house will be like.


The path, step by step

00

Your plot

Do you already have a design?

Yes

You bring your design

We recalculate it with our wall

No

01 · 20-minute call

02 · Feasibility study (48 h)

03 · Design and fixed price

04

Contract and licence

05

Construction, payments against milestones

06

Handover of the keys

Two sites per site manager, maximum

We do not grow by giving each manager more sites: we grow by hiring more managers. Every site manager runs two sites at a time at most, and that is something you can check on any given Tuesday.